Bridges and Tunnels Jenny Spratt Bridges and Tunnels Jenny Spratt

Bridge B-235

excerpt text here


Project description

 

For the Canton of Aargau, Stahlton assessed the condition of the post-tensioning in Bridge B-235. The inspection was carried out in two phases in 2025, one per traffic direction. Tendon layouts were mapped with GPR, and ultrasonic pulse-echo measurements identified potential grouting defects. Selected locations were verified through inspection openings and anchorage checks, complemented by a visual inspection. All findings were consolidated in INSPECT, providing the canton and the structural engineer with a reliable basis for maintenance decisions.


AQUILA’s contribution

xxx

Aerial view of Bridge B-235 during the inspection campaign with half-side lane closure.

 

Our process

GPR mapping of post-tensioning ducts and reinforcement using the Proceq GS9000.

Ultrasonic pulse-echo measurement with the Pundit PD8050 to detect grouting defects.

Inspection opening showing the condition of the duct and grout.

Read More